Search
Close this search box.

PowerPlus Technical Training

Team PowerPlus is running a not to be missed technical training on Designing Off-Grid Battery Systems totalling 30 Core CPD points. Space per session is limited to 60 people, secure your spot by clicking here.

PowerPlus designs and manufactures easy-to-use, easy-to-install, reliable and long-lasting energy storage. Our BESS, batteries and cabinet enclosures are all manufactured in Australia. With local support and quality, not only do you get a reliable product to power your projects but one that’s safe and designed to simplify everyone’s job.

Designing Off-Grid Battery Systems to Succeed

Earn 30 Core CPD points, 60 minutes

This session is aimed at installers who are interested in larger battery systems, either grid connect or off-grid, or are already designing and installing systems. The PowerPlus team will deliver training on design rules for designing reliable and stable stand-alone power systems including equipment selection and the resulting issues when rules are broken.

Presenter: Simon Ceglinski

Day 1, May 3
Session 1: 10:00-11:00 (Room E5.10)
Session 2: 12:00-13:00 (Room E5.10)
Session 3: 14:00-15:00 (Room E5.10)

Day 2, May 4
Session 1: 10:00-11:00 (Room E5.10)
Session 2: 12:00-13:00 (Room E5.10)
Session 3: 14:00-15:00 (Room E5.10)

 

Share this post

Keep Reading